Nature of the problem
Balcony in deteriorated condition (wood without air circulation to contribute to the deterioation of the columns)
The work performed
- Redo two full balconies and the tenant’s entrance
- Demolition of old balconies
- Protected structures with membrane
- Installation of new floor 3 3/8
- Manufacture of new stringers and steps
- Manufacturing and cabinetry
- Double fascia with OGEE molding at the junction of the boards and fascia
- Complete painting